Check the agreement first
See what your rent agreement says about repainting, damage and deductions. If it is unclear, settle it in writing before the next tenancy. This guide is not legal advice.
Inspect with the outgoing tenant
Walk through together, photograph walls and separate normal wear from damage. Ask about leaks or damp they noticed.
Touch-up or full repaint?
Touch-ups work only if the original shade and product are known and the paint has not faded. Otherwise patches stand out, and repainting a whole wall or room looks better.
Choose for the long run
- One standard light shade across the home
- A finish that tolerates cleaning
- No very dark or highly personal feature walls
- A written record of product and shade code
Use the vacancy well
Fix plumbing and electrical faults first, then paint, then deep clean. Allow drying time before the new tenant’s furniture arrives.
Related
Repainting and renovation painting
Plan the dates
The gap between tenants is often short. Ask the outgoing tenant for access to inspect before the last day, so that the scope and estimate are ready when the keys come back. Allow separate days for repairs, painting, drying and cleaning.
A landlord’s inspection list
- Walls behind beds, sofas and appliances
- Bathroom-adjacent walls and ceilings
- Kitchen walls near the cooking area
- Window frames, doors and grilles
- Balcony walls and any signs of seepage
Living away from the property
If you manage a Tricity flat from another city, nominate someone to give access and check the work. Ask for dated photos before, during and after, and agree in writing what is included.
Hand over with a record
Give the new tenant a note of the wall condition with photos, and say whether nails and wall fixtures are allowed. A clear starting record helps avoid arguments at the end of the tenancy.
Planning painting work?
Share your property details and what you would like done.
Book a Free Home Visit